Arvand Petrochemical Plant
CLIENT: Arvand Petrochemical Company











Arvand Petrochemical Company, one of the largest producers of PVC chain in the Middle East, has been established in Site 3 of Petrochemical Special Economic Zone and on a land area of 108 hectares to supply raw materials for downstream industries required by domestic and foreign markets. One of the important goals of this industrial and economic project is to produce valuable products such as S-PVC and E-PVC products, caustic and supply chlorine gas to a number of petrochemicals in the special zone, water and ethylene dichloride to meet the needs of domestic markets and export abroad.
Industrial salt and ethylene are the main feedstock of this petrochemical company, and 1,300,000 tons of salt is transported to Arvand Petrochemical Company through salt lakes in Bandar Imam Khomeini city after purification in the salt washing plant and conversion into brine using a 22-kilometer pipeline. In the chlor-alkali plant of Arvand Petrochemical Company, brine is converted into chlorine gas and hydrogen by electrolysis. In addition to producing petrochemical products, Arvand Petrochemical Company is committed to fulfilling its mission in the field of environmental protection and maintenance, and for this reason, modern technology has been used in the chlor-alkali unit to avoid the use of mercury.
Basic and detailed design, engineering, procurement and construction of a salt washing and optimization plant were carried out between 2005 and 2010 under the trade of Arvand Petrochemical Company at Bandar Imam Khomeini, Khuzestan Province. The project covered an area of 160,000 square meters with a height of 25 meters and was implemented for the first time in the country by utilizing Iranian engineering capabilities in cooperation with international companies including K-UTEC Germany, C.A.C Germany and NOVOPRO Canada.
Remaining construction activities, installation and commissioning of refrigeration and electrical equipment related to Unit C931 of Arvand Petrochemical Complex were completed as part of ITCEN Company's activities.
After eight years of operation, improvement and major repair studies of the Arvand Petrochemical Salt Washing Plant were assigned to ITCEN Company in 2018 to optimize equipment performance.
Procurement engineering, supply, transportation and installation preparation of 40×40 cm concrete piles and prefabricated channels for the construction of the salt washing plant.
Design, engineering, manufacturing, sandblasting, painting and transportation of a complete horizontal conveyor system consisting of 16 conveyor belts.
Engineering, procurement and pre-commissioning of two stacker machines and two conveyor machines including design, material procurement, construction and delivery.
Supply and installation of nine metal tanks including materials, accessories, sandblasting, painting, anchor bolts, mixer supports, stairs, walkways and spare parts with a total weight of 88 tons.
Procurement of GRP pipes, fittings, elbows, reducers and related accessories with a total weight of 7000 kg for the salt washing project.
Transportation, welding, bolting and complete installation of metal building structures, including process unit structures and grating plates with a total weight of approximately 450 tons.
Procurement and transportation of chillers, air condensers, air handling units, electrical equipment, precision instruments, exhaust fans, centrifuges, panels and other required project equipment.