Other marine and port projects
CLIENT: Various Clients (Port and Maritime Organizations, Navy, and related maritime companies







The Imam Khomeini Port Special Economic Zone now plays a role as one of the most important regional transportation hubs. After changing its legal regime from a regular port to a special economic zone in 2011 and annexing adjacent lands, the port now forms the largest special economic zone in the country with an area of over 11,000 hectares. With 40 active docks, this zone is the largest active port in Iran and accepts 70 million tons of goods annually. This zone is the largest commercial zone in Iran after the Shahid Rajaee Port Special Economic Zone, which is connected to Tehran by Highway 5 and the national railway.
ITCEN Company has successfully provided engineering, procurement, construction, maintenance and consulting services for various maritime transportation and port infrastructure projects. The following projects represent some of the key activities carried out in Imam Khomeini Port and related facilities.
Supervision of operation and maintenance of transit silo equipment, land equipment, marine equipment and telecommunication systems of Imam Khomeini Port continued through contract extensions from 1999 to 2010.
Supervision of installation and commissioning of emergency power plant equipment at Imam Khomeini Port was carried out in 2005 to improve reliability of port power supply systems.
Supervisory and workshop supervision services for rail installation, unloader installation at the quay, and reconstruction of material transfer tunnels were provided for Iran Aluminum Joint Stock Company in 2005.
Preparation of preliminary studies, comprehensive equipment purchasing plans, technical specifications, tender documentation and technical evaluation for grain unloading equipment were carried out between 2001 and 2004.
Design services for different phases of coastal repair yards and the Bandar Imam Marine Repair Yards Complex were carried out in 2002 and 2003.
Design, equipment supply, transportation, installation and commissioning of a wastewater treatment plant for 400 residential units in Bandar Imam Khomeini were completed under the patronage of Khuzestan Ports and Maritime Affairs Administration in 2002.
Design of the second phase and preparation of executive plans for onshore repair workshops for light and heavy vehicles were carried out under the supervision of Khuzestan Ports and Shipping Administration in 2000.
Supervision of repair, maintenance and proper operation of grain transit silo equipment located at Imam Khomeini Port was carried out under the responsibility of Khuzestan Ports and Maritime Affairs Administration between 1997 and 1998.
Supply, delivery, installation and commissioning of electrical and mechanical equipment, machinery, steel structures, special tools and spare parts for a 100,000-ton mechanized wheat warehouse at Imam Khomeini Port were completed in 1996.
Engineering consulting services for electrical and mechanical facilities and equipment of the Imam Khomeini Port Grain Transit Silos Complex were carried out under the patronage of the Ports and Shipping Organization. This project was among the first maritime transportation projects of ITCEN Company, with cooperation continuing until 1996.

CLIENT: Various Clients (Port and Maritime Organizations, Navy, and related maritime companies

CLIENT: General Port and Maritime Administration of Khorramshahr Port

CLIENT: Various Khuzestan Ports and Maritime Affairs Administration