Project Introduction

Line No. 1, as the main underground line with stations and two separate round-trip tunnels from Baqaei power plant in the southwest of Ahvaz, is come to an end. According to the decision of the Traffic Council, the length of Line 1 is 23 km with 244 stations, and the maximum travel time from the beginning to the end of the road is estimated at about 40 minutes.

The subject of the project is conducting identical and non-identical studies of all buildings and Iqbal depot enclosure (including heavy repair hall, parking hall and visit hall, infrastructure repair hall, central engine room building and substations, warehouse, automatic car wash building) and Golestan parking lot (including parking, Office building, substation, water and diesel tanks).