Tabriz Urban Train

Tabriz Urban Train Project

The services of ITCEN in the Tabriz Urban Train Project began with the design of the first phase of the El Goli Depot Stop Hall and Repair Shop of Tabriz Urban Train Line 1 in 2003, commissioned by the Tabriz Urban Train Organization. This cooperation continued until 2024 through various engineering, consulting, design and technical support activities.

Technical Specifications and Consulting Services for Repair Shops Design - 2024

Preparation of technical specifications for equipment and provision of consulting services for the design of light and heavy repair shops of the Tabriz Urban Train System.

Consulting Services for El Goli Depot Equipment Tender - 2012

Preparation of technical specifications, tender documents and consulting services for conducting the procurement tender of El Goli Depot equipment.

Design of the First and Second Phases of Laleh Depot Buildings of Tabriz Urban Train Line 1 - 2009

Engineering and design services for the first and second phases of Laleh Depot buildings related to Line 1 of Tabriz Urban Train.

Consulting Services for Light and Heavy Repair Shops of Tabriz Rail Transport System - 2003

Provision of consulting services for the design and development of light and heavy repair shop facilities of the Tabriz Urban Rail Transport System.

CLIENT: Tabriz Urban Train Organization
DATE: 2003 - 2024
STATUS: Completed
CATEGORY: Railways