
Pars Industrial Soot Factory
CLIENT: Pars Industrial Soot Factory


The consulting and supervision project for the construction of the Turning Wagon and Material Handling System at the Mianeh Steel Complex commenced in 2024 and is currently in progress. ITCEN provides comprehensive engineering consultancy, design review, tender documentation, and construction supervision services throughout the project lifecycle.
The scope of services includes reviewing engineering documents, drawings and technical data sheets of the existing facilities, identifying infrastructure deficiencies related to railway systems, electrical works, instrumentation, mechanical systems, concrete and steel structures, and material handling equipment. The project also covers conceptual design for equipment layout, preparation of basic engineering documents, development of EPC tender documentation, high-level and workshop supervision, as well as inspection and quality control of equipment manufacturing and construction activities at the Mianeh Steel Complex.

CLIENT: Pars Industrial Soot Factory

CLIENT: Mianeh Steel Complex

CLIENT: Ministry of Mines and Metals – General Iranian Mines Joint Stock Company