Arvand Petrochemical Plant
CLIENT: Arvand Petrochemical Company









Consulting services for development of physical asset management processes were completed in 2025.
Consulting services related to corrosion studies, material selection and alloy selection for piping systems were completed in 2024.
Technical engineering services were provided and completed in 2023.
Physical Asset Management Consulting and ISO 55000 based implementation were completed in 2023.
Engineering services for procurement of ship loader equipment for urea products were completed in 2022.
Establishment of physical asset management system including assessment, roadmap development, training and strategic planning was completed in 2019.
Physical Asset Management and RCM deployment were completed in 2018 through training, strategy development, equipment analysis and health indexdefinition.
Physical Asset Management Consulting services including assessment, roadmap development, training and strategic planning were completed in 2016.
Self-assessment process implementation and physical asset management roadmap development were completed in 2016.
Evaluation and improvement roadmap development of the physical asset management system was completed in 2015.
Architectural, civil, electrical and mechanical studies, senior supervision and purchasing engineering services were completed for Panahsaz Iran Company in 2012.
Technical, economic and market studies of Ibn Sina Petrochemical Complex in Hamedan were completed in 2012.
Management consulting, land preparation consultation, workshop supervision and layout design of the petrochemical complex construction area were completed between 2009 and 2010.
Detailed design of electrical and mechanical installations of industrial buildings of Bandar Abbas Refinery was completed in 2010.
Design, installation, commissioning and pre-commissioning of oxygen package systems including construction completion, plumbing and electrical operations were completed in 2010.
Engineering services for the first phase of construction and commissioning of the salt extraction unit from Lake Urmia were completed in 2008. Geotechnical engineering, environmental impact assessment and surveying studies were also carried out.
Design and preparation of land and layout of units for the construction of a 300,000-ton lightweight polyethylene production unit were completed in 2004. The lighting system design for the access road was also completed in 2005.
Consulting services related to purchasing pumps and spare parts were provided for Jam Pilen Petrochemical Company.

CLIENT: Arvand Petrochemical Company

CLIENT: Iranian Mines and Mineral Industries Development and Renovation Organization (IMIDRO)

CLIENT: Bandar Imam Petrochemical Company