Other management, maintenance projects

Selected Projects

South Pars Gas Complex Company (M)

Consulting services for development of physical asset management processes were completed in 2025.

Gachsaran Oil and Gas Exploitation Company (E)

Consulting services related to corrosion studies, material selection and alloy selection for piping systems were completed in 2024.

Caspian Oil Company (E)

Technical engineering services were provided and completed in 2023.

Abadan Oil Refinery Company (M)

Physical Asset Management Consulting and ISO 55000 based implementation were completed in 2023.

Hengam Petrochemical Company (EP)

Engineering services for procurement of ship loader equipment for urea products were completed in 2022.

Tabriz Oil Refining Company (M)

Establishment of physical asset management system including assessment, roadmap development, training and strategic planning was completed in 2019.

Parsian Gas Refining Company (M)

Physical Asset Management and RCM deployment were completed in 2018 through training, strategy development, equipment analysis and health indexdefinition.

National Iranian Drilling Company (M)

Physical Asset Management Consulting services including assessment, roadmap development, training and strategic planning were completed in 2016.

National Iranian Petroleum Products Distribution Company (M)

Self-assessment process implementation and physical asset management roadmap development were completed in 2016.

Tehran Oil Refining Company (M)

Evaluation and improvement roadmap development of the physical asset management system was completed in 2015.

Persian Gulf Condensate Refinery (EP)

Architectural, civil, electrical and mechanical studies, senior supervision and purchasing engineering services were completed for Panahsaz Iran Company in 2012.

Ibn Sina Petrochemical Industries Company (E)

Technical, economic and market studies of Ibn Sina Petrochemical Complex in Hamedan were completed in 2012.

Dehloran Petrochemical (MC)

Management consulting, land preparation consultation, workshop supervision and layout design of the petrochemical complex construction area were completed between 2009 and 2010.

Bandar Abbas Refinery (E)

Detailed design of electrical and mechanical installations of industrial buildings of Bandar Abbas Refinery was completed in 2010.

Maroon Petrochemical (EPC)

Design, installation, commissioning and pre-commissioning of oxygen package systems including construction completion, plumbing and electrical operations were completed in 2010.

Miandoab Petrochemical (EP)

Engineering services for the first phase of construction and commissioning of the salt extraction unit from Lake Urmia were completed in 2008. Geotechnical engineering, environmental impact assessment and surveying studies were also carried out.

Kurdistan Petrochemical Project (E)

Design and preparation of land and layout of units for the construction of a 300,000-ton lightweight polyethylene production unit were completed in 2004. The lighting system design for the access road was also completed in 2005.

Jam Pilen Petrochemical Company (P)

Consulting services related to purchasing pumps and spare parts were provided for Jam Pilen Petrochemical Company.

See More
CLIENT: Various Clients (Petrochemical, Refinery & Oil and Gas Companies)
DATE: 2004 - 2025
STATUS: Completed